The Callisto Protocol (2022)

Dilapidated mining equipment for the mining town level.

Dilapidated mining equipment for the mining town level.

Laser cutter.

Laser cutter.

Winch.

Winch.

Welder.

Welder.

Vertical winch.

Vertical winch.

One of the "pods" seen scattered throughout the minetown level.

One of the "pods" seen scattered throughout the minetown level.

Centrifuge.

Centrifuge.

Lab equipment.

Lab equipment.

Old rusty drawer.

Old rusty drawer.

The Callisto Protocol (2022) was my first shipped AAA title, and it was one of my most invaluable experiences in my professional career. The folks I worked with were all top notch talent with years more experience than I had. Unfortunately, I cannot publicly disclose any technical detail or breakdown beyond my abundant use of HardOps for Blender and Substance Painter.

Album
Date
March 18, 2025